No. Year Country & Client Project Name
24

2004

Ghana VITOL S.A

Rehabilitation of G-52 & 14” Pipeline.

25 Ghana SK Engineering

Installation of Temporary Facilities at Savelugu (B2P3)

26 Ghana SK Engineering

Construction of Savelugu Boosting Pump Station & 8” Pipeline (Long Distance)

27

2005

Ghana TOR

Supply and Construction of Atmospheric Residue and Gasoline Tanks And product pipeline

28 Ghana Volta River Authority

Rust Control Works at Takoradi Thermal Power Station

29 Ghana TOR

Reconstruction of Floating Roof for Tank G-53

30

2006

Ghana TOR

Supply and Construction of 2 no. 3,000M³ LPG Spherical Tanks and product pipelines

31 Ghana TOR

Installation of Double Bleed and Block Valves

32

2007

Ghana TOR

Rehabilitation of G-56 (55,000 CUM) at TOR

33

2008

Ghana TOR

Supply & Construction of 2No.ⅹ84,000cum & 1No.ⅹ30,000cum Storage Tank

34 Ghana CIRRUS/VITOL

Supply & Construction of Loading Gantry at Tema including 5,000m 10”, 12” Pipeline (5,000m)